We build rooms from 8 cubic metres to complete freezer warehouses, with the doors, the floor and the controls that suit your logistics.
The choice of refrigerant, evaporator and controls is fixed once the installation is handed over. We calculate your process on the actual load, including the peaks, and record the design criteria before we purchase.
-25 to +5 °C
5 to 400 kW
CO2, propane or HFO
80 to 200 mm
12 to 20 weeks
For each installation we choose the refrigerant and the control system that give the lowest consumption within your process. That lowers your energy bill and keeps you ahead of legislation.
In most cases it can. We phase the construction and commission circuits independently of each other. At Kroon Koelopslag the new circuit was commissioned before the old one was converted, without a single day of downtime.
In most cases it can. We phase the construction and commission circuits independently of each other. At Kroon Koelopslag the new circuit was commissioned before the old one was converted, without a single day of downtime.
In most cases it can. We phase the construction and commission circuits independently of each other. At Kroon Koelopslag the new circuit was commissioned before the old one was converted, without a single day of downtime.
In most cases it can. We phase the construction and commission circuits independently of each other. At Kroon Koelopslag the new circuit was commissioned before the old one was converted, without a single day of downtime.
Expansion from 1,400 to 2,600 pallet positions while deliveries ran six days a week.
Two separate CO2 freezing circuits, commissioned in phases outside delivery hours.
Lower consumption
Days of downtime