For each project you can read the core question, the solution and the result in figures. The figures in this design are examples, they will be replaced by the confirmed set.
0.3 °C
Maximum deviation
18
Weeks lead time
Featured project
Four climate chambers in an existing hall
Four chambers each with their own setpoint, built in a hall that was already full. Handed over with a measurement report per chamber and central logging with alarms.